Difference between revisions of "Mission X Budget"
From OpenLuna
(→Stage 1:) |
(link has been added) |
||
Line 16: | Line 16: | ||
Based on results of Stage 2, namely the details of the end-to-end mission design | Based on results of Stage 2, namely the details of the end-to-end mission design | ||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 15:07, 8 August 2008
Bootstrapping our way to the Moon
Stage 1:
Week Long Team meeting $20,000
Preliminary visit with JPL or Goddard Integrated Design Center $100,000
Stage 2:
Week Long Team Meeting $20,000
end-to-end mission design visit with JPL/Goddard $300,000
Stage 3:
Based on results of Stage 2, namely the details of the end-to-end mission design