LSS todo

From OpenLuna
Revision as of 02:54, 15 February 2010 by Paul (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Please enter your suggested items for the todo list below.

- Create maintenance checklist. Lunar Surface Suit Maintenance Checklist

- Develop operating requirements for PLSS

- work up daily consumable needs

- develop some damage control systems for suit. (For example, If the lacing is cut, a method such as a "Chinese finger cuff" that could be used, and perhaps stitched into the lace to allow it to still be used, perhaps along with a method of "Stapling" the pullies together while completing repairs, allowing the suit to be worn while being repaired in a vacuum.)

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox