Mission X Budget

From OpenLuna
Revision as of 16:07, 8 August 2008 by Jbridge21 (Talk | contribs)

Jump to: navigation, search

Bootstrapping our way to the Moon

Stage 1:

Week Long Team meeting $20,000

Preliminary visit with JPL or Goddard Integrated Design Center $100,000

Stage 2:

Week Long Team Meeting $20,000

end-to-end mission design visit with JPL/Goddard $300,000

Stage 3:

Based on results of Stage 2, namely the details of the end-to-end mission design

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox