Bootstrapping our way to the Moon
 
Bootstrapping our way to the Moon
  
Line 6: Line 5:
 
Week Long Team meeting $20,000
 
Week Long Team meeting $20,000
  
Preliminary visit with JPL or [http://idc.nasa.gov/ Goddard Integrated Design Center]  $100,000
+
Preliminary visit with [http://www.jpl.nasa.gov/ JPL] or [http://idc.nasa.gov/ Goddard Integrated Design Center]  $100,000
  
 
== Stage 2: ==
 
== Stage 2: ==

Revision as of 16:06, 8 August 2008

Bootstrapping our way to the Moon

Contents

Stage 1:

Week Long Team meeting $20,000

Preliminary visit with JPL or Goddard Integrated Design Center $100,000

Stage 2:

Week Long Team Meeting $20,000

end-to-end mission design visit with JPL/Goddard $300,000

Stage 3:

Based on results of Stage 2, namely the details of the end-to-end mission design

conversations

Anyone have the link for JPL? I'll get back to it.