Difference between revisions of "Mission X Budget"
From OpenLuna
(→Stage 1:) |
|||
Line 1: | Line 1: | ||
− | |||
Bootstrapping our way to the Moon | Bootstrapping our way to the Moon | ||
Line 6: | Line 5: | ||
Week Long Team meeting $20,000 | Week Long Team meeting $20,000 | ||
− | Preliminary visit with JPL or [http://idc.nasa.gov/ Goddard Integrated Design Center] $100,000 | + | Preliminary visit with [http://www.jpl.nasa.gov/ JPL] or [http://idc.nasa.gov/ Goddard Integrated Design Center] $100,000 |
== Stage 2: == | == Stage 2: == |
Revision as of 16:06, 8 August 2008
Bootstrapping our way to the Moon
Contents |
Stage 1:
Week Long Team meeting $20,000
Preliminary visit with JPL or Goddard Integrated Design Center $100,000
Stage 2:
Week Long Team Meeting $20,000
end-to-end mission design visit with JPL/Goddard $300,000
Stage 3:
Based on results of Stage 2, namely the details of the end-to-end mission design
conversations
Anyone have the link for JPL? I'll get back to it.