Difference between revisions of "Mission X Budget"

From OpenLuna
Jump to: navigation, search
Line 1: Line 1:
Register Team $1000
+
 
 +
Bootstrapping our way to the Moon
 +
 
 +
== Stage 1: ==
  
 
Week Long Team meeting $20,000
 
Week Long Team meeting $20,000
  
 
Preliminary visit with JPL or [http://idc.nasa.gov/ Goddard Integrated Design Center]  $100,000
 
Preliminary visit with JPL or [http://idc.nasa.gov/ Goddard Integrated Design Center]  $100,000
 +
 +
== Stage 2: ==
  
 
Week Long Team Meeting $20,000
 
Week Long Team Meeting $20,000
Line 9: Line 14:
 
end-to-end mission design visit with JPL/Goddard $300,000
 
end-to-end mission design visit with JPL/Goddard $300,000
  
== conversations ===
+
== Stage 3: ==
 +
 
 +
Based on results of Stage 2, namely the details of the end-to-end mission design
 +
 
 +
== conversations ==
  
 
Anyone have the link for JPL?
 
Anyone have the link for JPL?
 
I'll get back to it.
 
I'll get back to it.

Revision as of 03:38, 5 August 2008

Bootstrapping our way to the Moon

Contents

Stage 1:

Week Long Team meeting $20,000

Preliminary visit with JPL or Goddard Integrated Design Center $100,000

Stage 2:

Week Long Team Meeting $20,000

end-to-end mission design visit with JPL/Goddard $300,000

Stage 3:

Based on results of Stage 2, namely the details of the end-to-end mission design

conversations

Anyone have the link for JPL? I'll get back to it.

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox