Difference between revisions of "Mission X Budget"
From OpenLuna
Line 1: | Line 1: | ||
− | + | ||
+ | Bootstrapping our way to the Moon | ||
+ | |||
+ | == Stage 1: == | ||
Week Long Team meeting $20,000 | Week Long Team meeting $20,000 | ||
Preliminary visit with JPL or [http://idc.nasa.gov/ Goddard Integrated Design Center] $100,000 | Preliminary visit with JPL or [http://idc.nasa.gov/ Goddard Integrated Design Center] $100,000 | ||
+ | |||
+ | == Stage 2: == | ||
Week Long Team Meeting $20,000 | Week Long Team Meeting $20,000 | ||
Line 9: | Line 14: | ||
end-to-end mission design visit with JPL/Goddard $300,000 | end-to-end mission design visit with JPL/Goddard $300,000 | ||
− | == | + | == Stage 3: == |
+ | |||
+ | Based on results of Stage 2, namely the details of the end-to-end mission design | ||
+ | |||
+ | == conversations == | ||
Anyone have the link for JPL? | Anyone have the link for JPL? | ||
I'll get back to it. | I'll get back to it. |
Revision as of 02:38, 5 August 2008
Bootstrapping our way to the Moon
Contents |
Stage 1:
Week Long Team meeting $20,000
Preliminary visit with JPL or Goddard Integrated Design Center $100,000
Stage 2:
Week Long Team Meeting $20,000
end-to-end mission design visit with JPL/Goddard $300,000
Stage 3:
Based on results of Stage 2, namely the details of the end-to-end mission design
conversations
Anyone have the link for JPL? I'll get back to it.