Difference between revisions of "Mission 3"
From OpenLuna
Navigaiter (Talk | contribs) |
Navigaiter (Talk | contribs) |
||
Line 1: | Line 1: | ||
Pathfinder class missions will have solo human Pathfinders evaluating and preparing a site for the M4 crew to follow which will install a five-person HabTank. | Pathfinder class missions will have solo human Pathfinders evaluating and preparing a site for the M4 crew to follow which will install a five-person HabTank. | ||
− | The human | + | The human Pathfinder will have a [[Pathfinder Bobcat]] machine to help grade the Habsite. |
Revision as of 18:23, 29 June 2009
Pathfinder class missions will have solo human Pathfinders evaluating and preparing a site for the M4 crew to follow which will install a five-person HabTank.
The human Pathfinder will have a Pathfinder Bobcat machine to help grade the Habsite.