LSS todo
From OpenLuna
Please enter your suggested items for the todo list below.
- Create maintenance checklist. Lunar Surface Suit Maintenance Checklist
- Develop operating requirements for PLSS
- work up daily consumable needs
- develop some damage control systems for suit. (For example, If the lacing is cut, a method such as a "Chinese finger cuff" that could be used, and perhaps stitched into the lace to allow it to still be used, perhaps along with a method of "Stapling" the pullies together while completing repairs, allowing the suit to be worn while being repaired in a vacuum.)